2020 CDBG Sewer Treatment Plant Improvements REBID
One of 10,000+ projects Taiyo tracks in Mississippi.
Source: Dodge USA
Scope - The work shall consist essentially of the following type items: 1. Concrete coating rehabilitation of existing chlorine contact chamber, 2. Installation of two new 400 gpm submersible pumps in existing pumping compartment of chlorine contact chamber with new access hatches, and new discharge piping, valves, and concrete valve pit, 3. Installation of new chlorine feed system and sulfur diox
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial
- Location
- Crowder, Mississippi, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2020 CDBG Sewer Treatment Plant Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The work shall consist essentially of the following type items: 1. Concrete coating rehabilitation of existing chlorine contact chamber, 2. Installation of two new 400 gpm submersible pumps in existing pumping compartment of chlorine contact chamber with new access hatches, and new discharge piping, valves, and concrete valve pit, 3. Installation of new chlorine feed system and sulfur dioxide feed system, 4. Associated electrical work, and 5. Bypass pumping of chlorine contact chamber... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Crowder |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
