2020 Roadside Brushing
Sector: Hydro • Location: Bonnyville, Alberta, Canada
Source: Dodge USA
The M.D. of Bonnyville No. 87 is accepting proposals from qualified contractors to conduct our 2020 Roadside Brushing requirements. Terms of the contract include hand cutting and chipping, mulching or hydro axe mowing or any combination of these methods on a per project basis. All brush is to be removed from the entire road Right of Way or fence line, whichever is the least distance. There are 3 s
- Status
- Closed
- Sector
- Hydro, Road, Government, Commercial, Residential
- Location
- Bonnyville, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2020 Roadside Brushing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The M.D. of Bonnyville No. 87 is accepting proposals from qualified contractors to conduct our 2020 Roadside Brushing requirements. Terms of the contract include hand cutting and chipping, mulching or hydro axe mowing or any combination of these methods on a per project basis. All brush is to be removed from the entire road Right of Way or fence line, whichever is the least distance. There are 3 sites on this Request for Proposal ?Site A (Flat Lake Area), Site B (Lessard Area), and Site C (Ch... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Bonnyville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Hydro, Road, Government, Commercial, Residential |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent
