2020 Water Transmission Main Phase II
Sector: Water Supply and Storage • Location: Newfoundland and Labrador, Canada
Source: Infrastructure Canada
Project consists of installing a new chlorination system in the Town of Woodstock. The scope of the project includes installing new chlorination equipment, and replacing the building over the chlorination system. The project aims to provide the Town with reliable potable water and eliminating a long term boil water advisory.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial
- Location
- Newfoundland and Labrador, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about 2020 Water Transmission Main Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project consists of installing a new chlorination system in the Town of Woodstock. The scope of the project includes installing new chlorination equipment, and replacing the building over the chlorination system. The project aims to provide the Town with reliable potable water and eliminating a long term boil water advisory. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial |
Article published date | 2026-03-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
