2020/21 Asphalt Surfacing H97
Start · British Columbia · Last reported May 2020
Source: Dodge USA
39.8 Lane Km of Highway 97 Resurfacing between Salmon Valley Bridge and Odell Road. Works include: Mobilization, Quality Management, Traffic Management and Signing, Survey Layout, Aggregate Production, Asphalt Mix Design for Asphalt Pavement, Remove and Reinstall Existing Concrete Barrier, Cold Milling, Supply and Apply Emulsified Tack Coat, Asphalt Pavement, Asphalt Curbing, Shouldering, Temporar
- Status
- Prospective
- Sector
- Commercial, Bridge, Cement, Road, Mass Transit, Rail, Manufacturing (Industrial)
- Location
- Prince George, British Columbia, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2020/21 Asphalt Surfacing H97
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | 39.8 Lane Km of Highway 97 Resurfacing between Salmon Valley Bridge and Odell Road. Works include: Mobilization, Quality Management, Traffic Management and Signing, Survey Layout, Aggregate Production, Asphalt Mix Design for Asphalt Pavement, Remove and Reinstall Existing Concrete Barrier, Cold Milling, Supply and Apply Emulsified Tack Coat, Asphalt Pavement, Asphalt Curbing, Shouldering, Temporary Pavement Markings, Site Cleanup and Restoration. |
Procurement method |
Location
Country | Canada |
State | British Columbia |
City | Prince George |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Bridge, Cement, Road, Mass Transit, Rail, Manufacturing (Industrial) |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
