logo

2020/21 Prince Edward Island Transportation, Infrastructure and Energy - Local Bridge

Sector: Water Supply and Storage • Location: Prince Edward Island, Canada

Source: Infrastructure Canada

Project
Completed

This project includes the replacement of a single span (30’) timber bridge structure with a two span (60’) timber bridge structure in the community of Crapaud, Prince Edward Island. The existing structure was initially constructed in 1974. Based on inspections over the years the existing structure has a Bridge Condition Index (BCI) of 65.75, which would classify the current structure as being in f

Project Information FAQ

Project Information

4 Q
The project “2020/21 Prince Edward Island Transportation, Infrastructure and Energy - Local Bridge” is an infrastructure initiative in the Water Supply and Storage sector, located in Prince Edward Island, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project includes the replacement of a single span (30’) timber bridge structure with a two span (60’) timber bridge structure in the community of Crapaud, Prince Edward Island. The existing structure was initially constructed in 1974. Based on inspections over the years the existing structure has a Bridge Condition Index (BCI) of 65.75, which would classify the current structure as being in fair condition. The foundational elements of the bridge are beginning to fail and replacement is the best option. The scope of work includes removing existing infrastructure and creating a smaller causeway. New piles, stringers and decking will be constructed. New foreslopes for the four embankments will be constructed and lined with rip rap rock. This will allow the bridge structure to be constructed at a 1.1 metre higher elevation and will also provide protection from future erosion. The increase in elevation will provide greater capacity of water to flow through the structure during extreme weather events and high tides. As is the case in other structures across Prince Edward Island climate change is greatly affecting the Provinces bridge infrastructure. All designs are being completed with climate change as a major component in the design process. The project aims to improve the structural foundational elements of the bridge and allow improved access to industries in the area such as agriculture and tourism. The BCI of the replacement structure will be 100 once it is completed. The new structure will have a 75 year design life as per the Canadian Highway Bridge Design Code (CHBDC) requirements. Investments to bridge infrastructure in rural Prince Edward Island will contribute to the success of those communities. Among the priorities of our Department we have been working hard in developing a plan to address the infrastructure needs for rural Islanders while working with federal partners.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data