logo

2020/21 Prince Edward Island Transportation, Infrastructure and Energy - Local Bridge

Sector: Hotel • Location: Prince Edward Island, Canada

Source: Infrastructure Canada

Project
Completed

This project includes the replacement of a single span (30’) timber bridge structure with a two span (60’) timber bridge structure in the community of Crapaud, Prince Edward Island. The existing structure was initially constructed in 1974. Based on inspections over the years the existing structure has a Bridge Condition Index (BCI) of 65.75, which would classify the current structure as being in f

Status
Closed
Sector
Hotel, Forest Products and Packaging, Water Supply and Storage, Raw Materials, Bridge, Road, Government
Location
Prince Edward Island, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about 2020/21 Prince Edward Island Transportation, Infrastructure and Energy - Local Bridge

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “2020/21 Prince Edward Island Transportation, Infrastructure and Energy - Local Bridge” is an infrastructure initiative in the Hotel sector, located in Prince Edward Island, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project includes the replacement of a single span (30’) timber bridge structure with a two span (60’) timber bridge structure in the community of Crapaud, Prince Edward Island. The existing structure was initially constructed in 1974. Based on inspections over the years the existing structure has a Bridge Condition Index (BCI) of 65.75, which would classify the current structure as being in fair condition. The foundational elements of the bridge are beginning to fail and replacement is the best option. The scope of work includes removing existing infrastructure and creating a smaller causeway. New piles, stringers and decking will be constructed. New foreslopes for the four embankments will be constructed and lined with rip rap rock. This will allow the bridge structure to be constructed at a 1.1 metre higher elevation and will also provide protection from future erosion. The increase in elevation will provide greater capacity of water to flow through the structure during extreme weather events and high tides. As is the case in other structures across Prince Edward Island climate change is greatly affecting the Provinces bridge infrastructure. All designs are being completed with climate change as a major component in the design process. The project aims to improve the structural foundational elements of the bridge and allow improved access to industries in the area such as agriculture and tourism. The BCI of the replacement structure will be 100 once it is completed. The new structure will have a 75 year design life as per the Canadian Highway Bridge Design Code (CHBDC) requirements. Investments to bridge infrastructure in rural Prince Edward Island will contribute to the success of those communities. Among the priorities of our Department we have been working hard in developing a plan to address the infrastructure needs for rural Islanders while working with federal partners.

Original sector

Roads, Bridges and Trade Infrastructure

Budget

Location

Country

Canada

State

Prince Edward Island

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Hotel, Forest Products and Packaging, Water Supply and Storage, Raw Materials, Bridge, Road, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project