logo

2021-22 Capital Projects 14K Plus Active Transportation Routes

Sector: Water Supply and Storage • Location: Prince Edward Island, Canada

Source: Infrastructure Canada

Project
Completed

This project aims to create 14 kilometers of active transportation (AT) corridors in the province. Two AT Trail Projects (Upton Road - Charlottetown: 1.1 km and Route 6 - Cavendish: 0.8 km) involve earth excavation; storm sewer and catch basin installation; select borrow, granular A and asphalt seal B placement; and landscaping. For the Paved Shoulder Projects (Route 143 - Howlan: 1.6 km, Church H

Project Information FAQ

Project Information

5 Q
The project “2021-22 Capital Projects 14K Plus Active Transportation Routes” is an infrastructure initiative in the Water Supply and Storage sector, located in Prince Edward Island, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project aims to create 14 kilometers of active transportation (AT) corridors in the province. Two AT Trail Projects (Upton Road - Charlottetown: 1.1 km and Route 6 - Cavendish: 0.8 km) involve earth excavation; storm sewer and catch basin installation; select borrow, granular A and asphalt seal B placement; and landscaping. For the Paved Shoulder Projects (Route 143 - Howlan: 1.6 km, Church Hill Avenue - North Rustico: 0.7 km, Route 26 - Pownal: 8.0 km, and Route 13 - Crapaud: 1.4 km), the process includes cold planing the outside wheel path of the existing roadway and shoulder, placing asphalt levelling A in the cold planed section, and asphalt seal B over the full road width. Route 13 - Crapaud also has a 300m section with grade improvements to improve sight distance and safety. The final asphalt seal B is essential to enhance safety on these poorly conditioned roads.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data