logo
ProjectCompleted

2021-22 Capital Projects 14K Plus Active Transportation Routes

Sector: Water Supply and Storage • Location: Prince Edward Island, Canada

Source: Infrastructure Canada

This project aims to create 14 kilometers of active transportation (AT) corridors in the province. Two AT Trail Projects (Upton Road - Charlottetown: 1.1 km and Route 6 - Cavendish: 0.8 km) involve earth excavation; storm sewer and catch basin installation; select borrow, granular A and asphalt seal B placement; and landscaping. For the Paved Shoulder Projects (Route 143 - Howlan: 1.6 km, Church H

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Road, Government
Location
Prince Edward Island, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about 2021-22 Capital Projects 14K Plus Active Transportation Routes

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “2021-22 Capital Projects 14K Plus Active Transportation Routes” is an infrastructure initiative in the Water Supply and Storage sector, located in Prince Edward Island, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project aims to create 14 kilometers of active transportation (AT) corridors in the province. Two AT Trail Projects (Upton Road - Charlottetown: 1.1 km and Route 6 - Cavendish: 0.8 km) involve earth excavation; storm sewer and catch basin installation; select borrow, granular A and asphalt seal B placement; and landscaping. For the Paved Shoulder Projects (Route 143 - Howlan: 1.6 km, Church Hill Avenue - North Rustico: 0.7 km, Route 26 - Pownal: 8.0 km, and Route 13 - Crapaud: 1.4 km), the process includes cold planing the outside wheel path of the existing roadway and shoulder, placing asphalt levelling A in the cold planed section, and asphalt seal B over the full road width. Route 13 - Crapaud also has a 300m section with grade improvements to improve sight distance and safety. The final asphalt seal B is essential to enhance safety on these poorly conditioned roads.

Original sector

Active Transportation

Budget

Location

Country

Canada

State

Prince Edward Island

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Road, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project