2021-22 Prince Edward Home Active Transportation
Sector: Water Supply and Storage • Location: Prince Edward Island, Canada
Source: Infrastructure Canada
Project: This project consists of constructing an active transportation trail at the Prince Edward Home Long Term Care Facility in Charlottetown, PE. Scope: Work includes constructing a 2.5 m wide, paved trail for approximately 350 metres and installing storm sewer for drainage. We believe that the creation of this park will enhance connectivity in the community; promote social inclusion; increas
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Stadium, Residential, Government
- Location
- Prince Edward Island, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about 2021-22 Prince Edward Home Active Transportation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project: This project consists of constructing an active transportation trail at the Prince Edward Home Long Term Care Facility in Charlottetown, PE. Scope: Work includes constructing a 2.5 m wide, paved trail for approximately 350 metres and installing storm sewer for drainage. We believe that the creation of this park will enhance connectivity in the community; promote social inclusion; increase intergenerational interaction; promote physical activity and positive mental health/well-being; and ultimately increase the overall healthy living of all Islanders. Aim: Although open to all Islanders, this will be located directly on the grounds of the Prince Edward Home. The venue includes a scenic outdoor space that is currently underutilized and undeveloped. Additionally, the proposed plan entails connectivity to an adjacent trail system further expanding the community reach of the site. This project will provide a safe space for Islanders to be more active and stay connected. The creation of continuous circulation loops within the park will promote safe active transportation for everyone as the pathways will be positioned away from busy streets and heavily trafficked areas. The Park will also be a safe area where families can take children to be active and enjoy nature. The walkways will be paved and wheel chair accessible which will allow safe physical activity for all demographics and abilities. It also allows for additional modes of active transportation such as rollerblading, skateboarding, and cycling. |
Original sector | Active Transportation |
Budget |
Location
Country | Canada |
State | Prince Edward Island |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Stadium, Residential, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
