2021 CMOM Package 2 PB and OC
Sector: Water Supply and Storage • Location: San Antonio, Texas, United States of America
Source: Dodge
construction of approximately 5,182 linear feet of 8-inch to 24-inch existing SAWS sanitary sewer pipeline using open cut construction, 28 linear feet of 12-inch sewer main installed in 24-inch steel casing by jacking or boring, and rehabilitation of approximately 1,478 linear feet of 8-inch to 12-inch existing SAWS sanitary sewer pipeline using pipebursting and point repair
- Status
- Closed
- Sector
- Water Supply and Storage, Steel, Government, Waste Processing and Treatment, Commercial, Metal
- Location
- San Antonio, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2021 CMOM Package 2 PB and OC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | construction of approximately 5,182 linear feet of 8-inch to 24-inch existing SAWS sanitary sewer pipeline using open cut construction, 28 linear feet of 12-inch sewer main installed in 24-inch steel casing by jacking or boring, and rehabilitation of approximately 1,478 linear feet of 8-inch to 12-inch existing SAWS sanitary sewer pipeline using pipebursting and point repair |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | San Antonio |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Government, Waste Processing and Treatment, Commercial, Metal |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
