logo
ProjectClosed

2021 Linkletter Ave Central Bedeque

Closed · Prince Edward Island · Last reported May 2021

Source: Dodge USA

Linkletter Ave ? Central Bedeque 2021 District 19 Section 40226, Station 0-541 For a distance of 0.541 km The work begins at the intersection of Route 1A and Linkletter Avenue and proceeds south on Linkletter Avenue for a distance of 541 metres. The work includes: Earth excavation, placing select borrow, placing granular A, installing storm sewer along east side of road, installing catch basins, d

Status
Closed
Sector
Water Supply and Storage, Road, Waste Processing and Treatment, Commercial
Location
Charlottetown, Prince Edward Island, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2021 Linkletter Ave Central Bedeque

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2021 Linkletter Ave Central Bedeque” is an infrastructure initiative in the Water Supply and Storage sector, located in Charlottetown, Prince Edward Island, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Linkletter Ave ? Central Bedeque 2021 District 19 Section 40226, Station 0-541 For a distance of 0.541 km The work begins at the intersection of Route 1A and Linkletter Avenue and proceeds south on Linkletter Avenue for a distance of 541 metres. The work includes: Earth excavation, placing select borrow, placing granular A, installing storm sewer along east side of road, installing catch basins, ditching, cold planing 2.4 metre strip along both sides of road (1.2 metres of asphalt and 1.2 met...

Procurement method

Budget

Location

Country

Canada

State

Prince Edward Island

City

Charlottetown

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Waste Processing and Treatment, Commercial

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project