logo
ProjectClosed

2021 Multi Use Path Resurfacing

Sector: Hotel • Location: Tofino, British Columbia, Canada

Source: Dodge USA

repair and resurfacing of approximately 460 lineal meters of Tofino s Multi Use Path (MUP) between Sharp Road and 1258 Pacific Rim Highway (Hotel Zed). The completed asphalt path is to be 4 m in width and include root guards installed along the east side of the MUP.

Status
Closed
Sector
Hotel, Road, Government, Commercial, Manufacturing (Industrial)
Location
Tofino, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2021 Multi Use Path Resurfacing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2021 Multi Use Path Resurfacing” is an infrastructure initiative in the Hotel sector, located in Tofino, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

repair and resurfacing of approximately 460 lineal meters of Tofino s Multi Use Path (MUP) between Sharp Road and 1258 Pacific Rim Highway (Hotel Zed). The completed asphalt path is to be 4 m in width and include root guards installed along the east side of the MUP.

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Tofino

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Hotel, Road, Government, Commercial, Manufacturing (Industrial)

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project