2021 Multi Use Trail Program
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Work to be undertaken is generally described as: ? Mobilization and Demobilization ? Remove and dispose of asphalt trail surface and replace (pave) ? Remove and dispose of granular base and replace with 200 mm granular base course ? provisional ? Supply and Place 50 mm Light Traffic Asphalt Pavement (LT) ? Geotextile ? provisional ? Granular Base Course ? provisional ? Common Excavation ? prov
- Status
- Closed
- Sector
- Commercial, Road, Mass Transit, Government, Rail
- Location
- St. Albert, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2021 Multi Use Trail Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work to be undertaken is generally described as: ? Mobilization and Demobilization ? Remove and dispose of asphalt trail surface and replace (pave) ? Remove and dispose of granular base and replace with 200 mm granular base course ? provisional ? Supply and Place 50 mm Light Traffic Asphalt Pavement (LT) ? Geotextile ? provisional ? Granular Base Course ? provisional ? Common Excavation ? provisional ? Landscape Grading (topsoil and seed) maximum 0.5m both sides |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | St. Albert |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Mass Transit, Government, Rail |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
