2021 Streambank Stabilization
Bid results · North Carolina · Last reported Aug 2024
Source: Dodge USA
The Contract majorly consists of the following: stream stabilization through a variety of rehab methods including soft and hard bank and stream bottom protection, sanitary sewer pipe replacement, plantings, and minor stormwater infrastructure improvements. Ancillary tasks include, but are not limited to, grading efforts to ensure existing flow patterns are maintained.
- Status
- Closed
- Sector
- Waste Processing and Treatment, Commercial, Water Supply and Storage, Government
- Location
- Greensboro, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2021 Streambank Stabilization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Contract majorly consists of the following: stream stabilization through a variety of rehab methods including soft and hard bank and stream bottom protection, sanitary sewer pipe replacement, plantings, and minor stormwater infrastructure improvements. Ancillary tasks include, but are not limited to, grading efforts to ensure existing flow patterns are maintained. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Greensboro |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Commercial, Water Supply and Storage, Government |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
