2021 Water Main Replacement Project
One of 10,000+ projects Taiyo tracks in Washington.
Source: City of Bothell
This project replaced sections of older and smaller water and storm water pipes in downtown., This replaced pipes in downtown on Sunrise Dr., 93rd Pl. NE, and NE 190th St. between 107th Ave. NE and 108th Ave. NE. Construction started in Spring of 2021 (April) and was competed in late June of 2021., Contractors might have needed to access private property to move water meters to the right-of-way (R
- Status
- Closed
- Sector
- Water Supply and Storage, Government
- Location
- Bothell, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- City of Bothell
ConstructChat
Ask ConstructChat about 2021 Water Main Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project replaced sections of older and smaller water and storm water pipes in downtown., This replaced pipes in downtown on Sunrise Dr., 93rd Pl. NE, and NE 190th St. between 107th Ave. NE and 108th Ave. NE. Construction started in Spring of 2021 (April) and was competed in late June of 2021., Contractors might have needed to access private property to move water meters to the right-of-way (ROW). In this case, contractors would dig up the old meter on private property, move the meter to a new location in the ROW, and fill back in the hole on private property with topsoil, mulch, and grass seed., |
Location
Country | United States of America (USA) |
State | Washington |
City | Bothell |
Source
Source reliability | High |
Source | City of Bothell |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2023-10-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 55 @ CLARKS MILLPOND DAM
- West lake sammamish parkway phase 2
- 98th avenue se (97th place se) and se 11th street slope stabilization
- I-90 - sunset creek - fish passage
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- LEGALIZE ADDITION 394 SQ FT OF BATHROOM, PATIO COVER WATER HEATER RELOCATION & ASSOCIATED E/P. ADD NEW WALLS TO
