2022 - 2023 Grade C Storm Water Pipe Rehabilitation
Closed · Washington · Last reported Apr 2024
Source: Dodge USA
Work to be performed includes, but is not limited to: The improve-ment. of stormwater infrastruc-ture, particularly large diameter storm.water pipes using cured. in place pipe lining CIPP of 18-inch to 30-inch diameter storm pipes, and spot repair of failed pipe joints using sectional cured in place liner SCIPL of 18-, 21-, and 30-inch diameter storm pipe, closed-circuit television CCTV of 12-inch
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- Mill Creek, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2022 - 2023 Grade C Storm Water Pipe Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work to be performed includes, but is not limited to: The improve-ment. of stormwater infrastruc-ture, particularly large diameter storm.water pipes using cured. in place pipe lining CIPP of 18-inch to 30-inch diameter storm pipes, and spot repair of failed pipe joints using sectional cured in place liner SCIPL of 18-, 21-, and 30-inch diameter storm pipe, closed-circuit television CCTV of 12-inch diameter storm pipe, site restoration a nd miscellaneous items as further shown, described, and ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Mill Creek |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
