2022-23 Sanitary Re-Ligning Program
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The 2022-2023 Sanitary Lining Program consists of the lining of 54 sanitary mains (mostly in 200mm diameter) and 11 sewer service laterals (100mm diameter). The Work is located within the City of Grande Prairie, and the Town of Sexsmith. The intent of this project is to complete the lining program over a 2-year period.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial
- Location
- Grande Prairie, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2022-23 Sanitary Re-Ligning Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 2022-2023 Sanitary Lining Program consists of the lining of 54 sanitary mains (mostly in 200mm diameter) and 11 sewer service laterals (100mm diameter). The Work is located within the City of Grande Prairie, and the Town of Sexsmith. The intent of this project is to complete the lining program over a 2-year period. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Grande Prairie |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
