2022-23 Water Pipe Replacement
Sector: Metal • Location: Corvallis, Oregon, United States of America
Source: Dodge USA
The Base Bid work consists of constructing approximately 1,700 linear feet of open-trench 8-inch and 6- inch ductile iron waterline, 52 linear feet of 8-inch ductile iron waterline installed through bore and jack 16- inch steel casing under Dixon Creek, 180 linear feet of directionally-drilled 3-inch HDPE waterline, fittings, valves, joint restraint, thrust blocking, service laterals, air release
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Steel, Government, Commercial, Waste Processing and Treatment
- Location
- Corvallis, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2022-23 Water Pipe Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Base Bid work consists of constructing approximately 1,700 linear feet of open-trench 8-inch and 6- inch ductile iron waterline, 52 linear feet of 8-inch ductile iron waterline installed through bore and jack 16- inch steel casing under Dixon Creek, 180 linear feet of directionally-drilled 3-inch HDPE waterline, fittings, valves, joint restraint, thrust blocking, service laterals, air release valves, sample station, blow-off assemblies, fire hydrants and required appurtenances, restoring ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Corvallis |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Steel, Government, Commercial, Waste Processing and Treatment |
Article published date | 2023-05-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
