2022 Additional Paving
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Contractor is responsible for providing and installing all material and labor necessary to mill, resurface, and stripe the asphalt pavement of various roadways throughout Barrow County. The Contractor shall furnish and install all materials in accordance with the attached: Bid Form, eleven (11) Roadway Summaries, one hundred and fifty-one (151) pages of GDOT Documents & Special Provisions, fou
- Status
- Closed
- Sector
- Road, Government, Commercial, Manufacturing (Industrial)
- Location
- Winder, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2022 Additional Paving
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Contractor is responsible for providing and installing all material and labor necessary to mill, resurface, and stripe the asphalt pavement of various roadways throughout Barrow County. The Contractor shall furnish and install all materials in accordance with the attached: Bid Form, eleven (11) Roadway Summaries, one hundred and fifty-one (151) pages of GDOT Documents & Special Provisions, four (4) Location Maps, one (1) page of Typical Resurfacing Sections and one (1) page of Typical Sec... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Winder |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2023-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
