logo

2022 ARP Water Treatment Plant Improvements REBID

Sector: Water Supply and Storage • Location: Red Boiling Springs, Tennessee, United States of America

Source: Dodge

Project
Bid Results

The Project includes the following Work: Membrane treatment building and mechanical, plumbing, and electrical.

Status
Closed
Sector
Water Supply and Storage, Government, Power Generation (CCGT), Waste Processing and Treatment, Commercial
Location
Red Boiling Springs, Tennessee, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 2022 ARP Water Treatment Plant Improvements REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2022 ARP Water Treatment Plant Improvements REBID” is an infrastructure initiative in the Water Supply and Storage sector, located in Red Boiling Springs, Tennessee, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project includes the following Work: Membrane treatment building and mechanical, plumbing, and electrical.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Tennessee

City

Red Boiling Springs

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Power Generation (CCGT), Waste Processing and Treatment, Commercial

Article published date

2025-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project