2022 ARPA Water System Improvements
One of 10,000+ projects Taiyo tracks in Tennessee.
Source: Dodge USA
Installation of approximately 3,875 LF of 6 DIP Water Line 2. Installation of approximately 590 LF of 3 DIP Water Line 3. Installation of Gate Valves and Hydrants 3. Reconnection of service lines with PEXa 4. Connection to existing water lines 5. All other necessary and incidental work to complete the project in accordance with these plans and specifications.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Bethel Springs, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2022 ARPA Water System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Installation of approximately 3,875 LF of 6 DIP Water Line 2. Installation of approximately 590 LF of 3 DIP Water Line 3. Installation of Gate Valves and Hydrants 3. Reconnection of service lines with PEXa 4. Connection to existing water lines 5. All other necessary and incidental work to complete the project in accordance with these plans and specifications. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Bethel Springs |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
