logo
ProjectClosed

2022 CDBG ED Grant Biosolids REBID

Closed · Mississippi · Last reported Sep 2025

Source: Dodge

construction of the 2022 CDBG ED Grant #1138-21-075-ED-01. The work generally consists of: biological solids are present in a 10-million-gallon lagoon at an approximate depth of 6 ft in a water depth of 14 ft. Disposal of biosolids shall be conducted in accordance with a Land Application Plan prepared by the Owner s Engineer, as approved by the Mississippi Department of Environmental Quality. Soli

Status
Closed
Sector
Water Supply and Storage, Commercial, Waste Processing and Treatment, Government
Location
Vicksburg, Mississippi, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 2022 CDBG ED Grant Biosolids REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2022 CDBG ED Grant Biosolids REBID” is an infrastructure initiative in the Water Supply and Storage sector, located in Vicksburg, Mississippi, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

construction of the 2022 CDBG ED Grant #1138-21-075-ED-01. The work generally consists of: biological solids are present in a 10-million-gallon lagoon at an approximate depth of 6 ft in a water depth of 14 ft. Disposal of biosolids shall be conducted in accordance with a Land Application Plan prepared by the Owner s Engineer, as approved by the Mississippi Department of Environmental Quality. Solids removal shall conclude when the average solids depth remaining in the lagoon is 6 inches or le...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Mississippi

City

Vicksburg

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Waste Processing and Treatment, Government

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project