2022 Collection System
Sector: Road • Location: Charles Town, West Virginia, United States of America
Source: Dodge USA
Furnishing all labor, materials, equipment, and performance of work for the Charles Town Utility Board, 2022 Collection System Project. This contract consists of work for improvements to the Burr East Pump Station and force main, the Moose Lodge Pump Station and force main, the Jett s Farm Pump Station and force main, and the Flowing Springs Pump Station. Also included is the decommissioning of th
- Status
- Closed
- Sector
- Road, Government, Commercial, Hotel, Power Transmission, Raw Materials, Power Generation (CCGT), Waste Processing and Treatment, Water Supply and Storage
- Location
- Charles Town, West Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2022 Collection System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Furnishing all labor, materials, equipment, and performance of work for the Charles Town Utility Board, 2022 Collection System Project. This contract consists of work for improvements to the Burr East Pump Station and force main, the Moose Lodge Pump Station and force main, the Jett s Farm Pump Station and force main, and the Flowing Springs Pump Station. Also included is the decommissioning of the Forrest Avenue and 11th Street Pump Stations, construction of the Lakeland Place Pump Station a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | West Virginia |
City | Charles Town |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Hotel, Power Transmission, Raw Materials, Power Generation (CCGT), Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2024-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
