logo
ProjectClosed

2022 Replacement Structure 87

Closed · Ontario · Last reported Sep 2022

Source: Dodge USA

The removal and replacement of Structure 87 on Hyslop Line (closed road allowance) over McIntyre Drain. The work approximately consists of the supply of all labour, materials, equipment, and appurtenances necessary for the following: Removal of the existing concrete slab on steel I-girder bridge. Supply and installation of a new double-barrel precast concrete box culvert, two (2) precast concrete

Status
Closed
Sector
Commercial, Water Supply and Storage, Bridge, Cement, Road, Steel, Waste Processing and Treatment, Government, Metal
Location
Toronto, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2022 Replacement Structure 87

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2022 Replacement Structure 87” is an infrastructure initiative in the Commercial sector, located in Toronto, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The removal and replacement of Structure 87 on Hyslop Line (closed road allowance) over McIntyre Drain. The work approximately consists of the supply of all labour, materials, equipment, and appurtenances necessary for the following: Removal of the existing concrete slab on steel I-girder bridge. Supply and installation of a new double-barrel precast concrete box culvert, two (2) precast concrete cut-off walls, two (2) precast concrete headwalls, and four (4) precast concrete wingwalls. Suppl...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Toronto

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Bridge, Cement, Road, Steel, Waste Processing and Treatment, Government, Metal

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project