logo

2022 Road Sealant Project – Phase 1

Sector: Power Transmission • Location: California, United States of America

Source: Marin County Department of Public Works (DPW)

Project
Closed

One of the most important aspects of managing the County’s unincorporated road network condition is continual investment towards pavement preservation treatments.  These types of sealant projects represent relatively low-cost improvements that prolong the effective life of roadways in good to fair condition. This sealant project includes crack sealing, preservation treatments slurry seal or micros

Project Information FAQ

Project Information

5 Q
The project “2022 Road Sealant Project – Phase 1” is an infrastructure initiative in the Power Transmission sector, located in California, United States of America. Taiyo aggregates data on it from Marin County Department of Public Works (DPW).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

One of the most important aspects of managing the County’s unincorporated road network condition is continual investment towards pavement preservation treatments.  These types of sealant projects represent relatively low-cost improvements that prolong the effective life of roadways in good to fair condition. This sealant project includes crack sealing, preservation treatments slurry seal or microsurfacing, and striping on approximately 40 centerline miles of roadway across unincorporated areas of Marin County.  It is worth noting that this is one of the largest sealant projects the County has ever undertaken. The preservation treatments selected for this project were based on the current conditions of each road segment, utility coordination and scoping efficient road groupings. This sealant project has two objectives.  The first objective is to apply the pavement preservation treatment at the optimal time to extend the useful life of the roadway.  The second objective is to provide a stopgap measure to improve roads in the ‘poor condition’ category and defer repaving or reconstruction by 3 to 10 years depending on the condition at the time of application, reducing the cost per year of service life.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data