2022 RTEP Window 3 Transmission Project Modifications
Approved · United States · Last reported Jul 2025
Source: PJM Inside Lines
Scope modifications including final tie-ins and commissioning of Chanceford-Doubs 500 kV line, rebuild of 230 kV lines with double-circuit-capable poles, upgrades at Charlottesville substation, rerouting of 230 kV lines near Lockridge area adding 2 miles of new conductor.
- Status
- Prospective
- Sector
- Energy
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- PJM Inside Lines
ConstructChat
Ask ConstructChat about 2022 RTEP Window 3 Transmission Project Modifications
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope modifications including final tie-ins and commissioning of Chanceford-Doubs 500 kV line, rebuild of 230 kV lines with double-circuit-capable poles, upgrades at Charlottesville substation, rerouting of 230 kV lines near Lockridge area adding 2 miles of new conductor. |
Original sector | Energy |
Location
Country | United States of America (USA) |
Source
Source | PJM Inside Lines |
URL |
More Details
Record type | Project |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
