2022 Utility Upgrades
Closed · Alberta · Last reported Sep 2022
Source: Dodge USA
The main items of Work of this Contract include the following: Installation of 270 m of 300 mm HDPE Watermain. Installation of 215 m of 250 mm HDPE Watermain. Installation of 135 m of 150 mm HDPE Watermain. The Site of the Work of this Contract is located in Drumheller, Alberta.
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Mass Transit, Government, Rail, Commercial, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Drumheller, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2022 Utility Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main items of Work of this Contract include the following: Installation of 270 m of 300 mm HDPE Watermain. Installation of 215 m of 250 mm HDPE Watermain. Installation of 135 m of 150 mm HDPE Watermain. The Site of the Work of this Contract is located in Drumheller, Alberta. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Drumheller |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Mass Transit, Government, Rail, Commercial, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
