2023 ADA Ramps Highway Districts -2.3
Sector: Car parking • Location: Philadelphia, Pennsylvania, United States of America
Source: Dodge USA
This work includes the construction of ADA curb ramps including ramp design, roadway and footway restoration, ban crossing treatment installations, adjustment or resetting of manhole castings and inlets, and other incidental work necessary for the upgrading of ADA ramps in accordance with these specifications, and the Publication 408 Specifications of the Pennsylvania Department of Transportation,
- Status
- Closed
- Sector
- Car parking, Waste Processing and Treatment, Road, Water Supply and Storage, Automotive, Government, Commercial
- Location
- Philadelphia, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2023 ADA Ramps Highway Districts -2.3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This work includes the construction of ADA curb ramps including ramp design, roadway and footway restoration, ban crossing treatment installations, adjustment or resetting of manhole castings and inlets, and other incidental work necessary for the upgrading of ADA ramps in accordance with these specifications, and the Publication 408 Specifications of the Pennsylvania Department of Transportation, except as herein modified. Work also includes repairs of existing ramps at noted locations. The ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Philadelphia |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Waste Processing and Treatment, Road, Water Supply and Storage, Automotive, Government, Commercial |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
