2023 Asphalt Patching Project
One of 10,000+ projects Taiyo tracks in Washington.
Source: Dodge USA
The 2023 Asphalt Patching Project proposes to patch sections of substandard arterial and local streets located within city limits, and overlay NE Hollyhills Dr.. The general aspects of this work will involve traffic control, asphalt pulverization, planing bituminous pavement, asphalt overlay, and asphalt patchwork (paving).
- Status
- Closed
- Sector
- Road, Government, Commercial, Manufacturing (Industrial)
- Location
- Bothell, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2023 Asphalt Patching Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 2023 Asphalt Patching Project proposes to patch sections of substandard arterial and local streets located within city limits, and overlay NE Hollyhills Dr.. The general aspects of this work will involve traffic control, asphalt pulverization, planing bituminous pavement, asphalt overlay, and asphalt patchwork (paving). |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Bothell |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
