2023 Auburn Hills Paving Improvements
Sector: Water Supply and Storage • Location: Auburn Hills, Michigan, United States of America
Source: Dodge USA
Approximately 3.5 miles of 20 foot wide residential asphalt roadway replacement with intermittent concrete curb and gutter repair. Aggregate base grading and conditioning to place the proposed 5 inch HMA cross section with intermittent base and drainage structure repairs. Two road stub connections with corresponding utility connections
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Approximately 3.5 miles of 20 foot wide residential asphalt roadway replacement with intermittent concrete curb and gutter repair. Aggregate base grading and conditioning to place the proposed 5 inch HMA cross section with intermittent base and drainage structure repairs. Two road stub connections with corresponding utility connections |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
