logo
ProjectBid Results

2023 Booster Pump Control Panel Replacement

Bid results · Wisconsin · Last reported Nov 2023

Source: Dodge USA

The work included in this project is as follows: Booster Pump Control Panel Replacement - 1 LS \ Bids shall be accompanied by Bid Security in the form of a bid Bond, certified check, or cashier's check made payable to the Village of Butler in an amount of 5 percent (5%) of the Bidder s maximum Bid price. If the successful bidder fails to execute the contract and furnish the required bonds within 1

Status
Closed
Sector
Water Supply and Storage, Cable car, Hydro, Automotive, Government, Commercial, Waste Processing and Treatment, Telecommunications
Location
Butler, Wisconsin, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2023 Booster Pump Control Panel Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2023 Booster Pump Control Panel Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Butler, Wisconsin, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work included in this project is as follows: Booster Pump Control Panel Replacement - 1 LS \ Bids shall be accompanied by Bid Security in the form of a bid Bond, certified check, or cashier's check made payable to the Village of Butler in an amount of 5 percent (5%) of the Bidder s maximum Bid price. If the successful bidder fails to execute the contract and furnish the required bonds within 10 days after the Award, the Check or Bid Bond shall be forfeited to the Village as liquidated dam...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

Butler

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cable car, Hydro, Automotive, Government, Commercial, Waste Processing and Treatment, Telecommunications

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project