2023 Clarifier Drive Replacement
Sector: Wind • Location: Dolores, Colorado, United States of America
Source: Dodge USA
The project includes removal and disposal of existing drive unit, and installation of a new drive unit on a 110 diameter solid contact clarifier at the City of Cortez Water Treatment Plant, 27999 Road N, Dolores, CO 81323. The existing model that needs to be replaced is a (WesTech DS 43 Dual Shaft Drive, Model No. DV8026). Drive unit details: Rake drive size 2HP, Rake speed .026RPM, Turbine Drive
- Status
- Closed
- Sector
- Wind, Road, Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Dolores, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2023 Clarifier Drive Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes removal and disposal of existing drive unit, and installation of a new drive unit on a 110 diameter solid contact clarifier at the City of Cortez Water Treatment Plant, 27999 Road N, Dolores, CO 81323. The existing model that needs to be replaced is a (WesTech DS 43 Dual Shaft Drive, Model No. DV8026). Drive unit details: Rake drive size 2HP, Rake speed .026RPM, Turbine Drive size 7.5HP, Turbine speed 6.65 1.33 RPM, Duty Rated Torque 50,000 (ft/lbs), Torque Control settin... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Dolores |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Wind, Road, Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States of America
- NTIA Tribal Broadband Connectivity Program
- Pump Station 3 Replacement
- Reston Town Center Expansion
- 108th Avenue Northeast transit queue jump
- 4520 Barrett Road Tentative Parcel Map and Abandonment
- Abandonment Of Portions Of An I.O.D. And P.U.E. Located Within 4110 Winding Bluff Lane
- Whisper Wind Temporary Hardship Mobile Home
- 4450 Manzanita Ave (Winding Ranch) Pre Application Meeting
