logo
ProjectClosed

2023 CMP Lining Phase 2

Sector: Metal • Location: Tuscaloosa, Alabama, United States of America

Source: Dodge USA

Project Scope: Line existing corrugated metal pipe (CMP) at two locations and an alternate. The first location of the base bid is 26th Street and includes approximately 416 linear feet of 36 round pipe. The second location of the base bid is 26th Avenue and includes approximately 113 linear feet of 90 round pipe. The additional alternate location is 3496 Firethorn Drive and includes approximately

Status
Closed
Sector
Metal, Water Supply and Storage, Road, Government, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
Location
Tuscaloosa, Alabama, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2023 CMP Lining Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2023 CMP Lining Phase 2” is an infrastructure initiative in the Metal sector, located in Tuscaloosa, Alabama, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project Scope: Line existing corrugated metal pipe (CMP) at two locations and an alternate. The first location of the base bid is 26th Street and includes approximately 416 linear feet of 36 round pipe. The second location of the base bid is 26th Avenue and includes approximately 113 linear feet of 90 round pipe. The additional alternate location is 3496 Firethorn Drive and includes approximately 61 linear feet of 42 round pipe.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Alabama

City

Tuscaloosa

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Metal, Water Supply and Storage, Road, Government, Commercial, Manufacturing (Industrial), Waste Processing and Treatment

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project