2023 FWTP - Pump Station HVAC Upgrades
Sector: Power Generation (CCGT) • Location: Des Moines, Iowa, United States of America
Source: Dodge USA
The work includes, but is not necessarily limited to: Remove the existing rooftop unit at the pumping station, and replace with two new rooftop units, RTU-1 and RTU-2. Two new exhaust fans and an energy recovery unit will need to be provided and installed. All existing ductwork, fan-powered VAV boxes, and controls will be removed and replaced. Electrical and controls work to be included. Provide t
- Status
- Closed
- Sector
- Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial, Water Supply and Storage
- Location
- Des Moines, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2023 FWTP - Pump Station HVAC Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes, but is not necessarily limited to: Remove the existing rooftop unit at the pumping station, and replace with two new rooftop units, RTU-1 and RTU-2. Two new exhaust fans and an energy recovery unit will need to be provided and installed. All existing ductwork, fan-powered VAV boxes, and controls will be removed and replaced. Electrical and controls work to be included. Provide temporary cooling as needed |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Des Moines |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial, Water Supply and Storage |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
