2023 HMA Preventative Maintenance
Sector: Car parking • Location: Milton, Wisconsin, United States of America
Source: Dodge USA
The proposed base bid consists of preparation, crack sealing, chip sealing, and other miscellaneous items of work on approximately 10,000 lineal feet of roadway and parking areas. The proposed alternate bids consist of crack sealing work on approximately 12,000 lineal feet of roadway and parking areas.
- Status
- Closed
- Sector
- Car parking, Government, Automotive, Commercial, Manufacturing (Industrial)
- Location
- Milton, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2023 HMA Preventative Maintenance
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed base bid consists of preparation, crack sealing, chip sealing, and other miscellaneous items of work on approximately 10,000 lineal feet of roadway and parking areas. The proposed alternate bids consist of crack sealing work on approximately 12,000 lineal feet of roadway and parking areas. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Milton |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Government, Automotive, Commercial, Manufacturing (Industrial) |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
