logo

2023 LMIG Resurfacing REBID

Sector: Bridge • Location: Marietta, Georgia, United States of America

Source: Dodge USA

Project
Closed

The work to be done consists of furnishing all materials, labor, tools, skills, equipment, and incidentals for the construction of the aforementioned project. The approximate principal items for construction are 2023 LMIG Resurfacing. Allgood Road from US 41 to 75 Bridge 2400 Length 47 Width 12533 SY. Allgood Road turn lanes 800 Length, 12 Width, 1067 SY,, Hardage Farm Drive from Burn Hickory to C

Status
Closed
Sector
Bridge, Raw Materials, Road, Government, Commercial, Manufacturing (Industrial)
Location
Marietta, Georgia, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2023 LMIG Resurfacing REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2023 LMIG Resurfacing REBID” is an infrastructure initiative in the Bridge sector, located in Marietta, Georgia, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work to be done consists of furnishing all materials, labor, tools, skills, equipment, and incidentals for the construction of the aforementioned project. The approximate principal items for construction are 2023 LMIG Resurfacing. Allgood Road from US 41 to 75 Bridge 2400 Length 47 Width 12533 SY. Allgood Road turn lanes 800 Length, 12 Width, 1067 SY,, Hardage Farm Drive from Burn Hickory to CUL-DE-SAC 3500 Length, 20 Width, 7778 SY, Hardage Farm CUL-DE-SAC, Roosevelt Circle, Cole Street,...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Georgia

City

Marietta

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Raw Materials, Road, Government, Commercial, Manufacturing (Industrial)

Article published date

2023-05-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project