2023 Restroom Upgrade Program P2 / 2024 Restroom Upgrade
Sector: Metal • Location: Minneapolis, Minnesota, United States of America
Source: Dodge USA
Full restroom demolition, gut and remodel into Gate Hold seating; Restroom mirrors, electrified mirrors and grooming shelf installation; Restroom coat hook installation within restroom stalls and urinals; Trash compaction retro-fit installation at existing paper towel receptacle locations; Water closet & carriage replacement involving plumbing, piping, sanitary, CMU wall demolition and repair, til
- Status
- Closed
- Sector
- Metal, Airport, Water Supply and Storage, Forest Products and Packaging, Government, Commercial, Manufacturing (Industrial)
- Location
- Minneapolis, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2023 Restroom Upgrade Program P2 / 2024 Restroom Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Full restroom demolition, gut and remodel into Gate Hold seating; Restroom mirrors, electrified mirrors and grooming shelf installation; Restroom coat hook installation within restroom stalls and urinals; Trash compaction retro-fit installation at existing paper towel receptacle locations; Water closet & carriage replacement involving plumbing, piping, sanitary, CMU wall demolition and repair, tile and traffic coating work; Hollow Metal Doors & frames; Hardware; Gypsum Board partitions; Tile;... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Minneapolis |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Airport, Water Supply and Storage, Forest Products and Packaging, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
