logo

2023 Resurfacing Plan B CTC

Sector: Commercial • Location: North Charleston, South Carolina, United States of America

Source: Dodge USA

Project
Closed

The project, located in Charleston County, shall consist of resurfacing 23 miles of roads. The work shall include, but is not limited to, traffic control, asphalt milling, milled-in rumble strips, asphalt resurfacing, striping, full-depth patching, full-depth reclamation, concrete repairs, crack sealing, and associated appurtenances of various local paved roadways within the boundaries of Charlest

Status
Closed
Sector
Commercial, Cement, Power Transmission, Road, Government, Power Generation (CCGT), Manufacturing (Industrial)
Location
North Charleston, South Carolina, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2023 Resurfacing Plan B CTC

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2023 Resurfacing Plan B CTC” is an infrastructure initiative in the Commercial sector, located in North Charleston, South Carolina, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project, located in Charleston County, shall consist of resurfacing 23 miles of roads. The work shall include, but is not limited to, traffic control, asphalt milling, milled-in rumble strips, asphalt resurfacing, striping, full-depth patching, full-depth reclamation, concrete repairs, crack sealing, and associated appurtenances of various local paved roadways within the boundaries of Charleston County. The project will be constructed utilizing the items listed on the bid tab form in the ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

South Carolina

City

North Charleston

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Cement, Power Transmission, Road, Government, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2024-04-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project