2023 Road Reconstruction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
2023 Road Reconstruction Project 5th St. from Bay Avenue to Ocean Front and Borough Utility Replacement: The project involves approximately 1490 tons of Hot Mix Asphalt Top Course, 9,030 SY Pavement Milling and restoration including road restriping, concrete sidewalk, concrete curb, concrete driveway, landscaping and all other necessary to restore areas damaged by construction. Project also includ
- Status
- Closed
- Sector
- Power Transmission, Cement, Car parking, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Automotive, Manufacturing (Industrial), Commercial
- Location
- Beach Haven, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2023 Road Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 2023 Road Reconstruction Project 5th St. from Bay Avenue to Ocean Front and Borough Utility Replacement: The project involves approximately 1490 tons of Hot Mix Asphalt Top Course, 9,030 SY Pavement Milling and restoration including road restriping, concrete sidewalk, concrete curb, concrete driveway, landscaping and all other necessary to restore areas damaged by construction. Project also includes removal and replacement of 1,600 LF of 4 inch PVC SDR 26 sewer lateral and cleanout including ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Beach Haven |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Cement, Car parking, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Automotive, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
