2023 Road Sealant Project (Phase 2)
Sector: Power Transmission • Location: California, United States of America
Source: Marin County Department of Public Works (DPW)
The 2023 Road Sealant Project (Phase 2) includes crack sealing, slurry sealing, and new traffic striping on approximately 11.2 centerline miles of roadway in unincorporated areas of Marin. The preservation treatments selected for this project are based on the current condition of the road, utility coordination and efficient road groupings. These types of sealant projects represent relatively low-
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The 2023 Road Sealant Project (Phase 2) includes crack sealing, slurry sealing, and new traffic striping on approximately 11.2 centerline miles of roadway in unincorporated areas of Marin. The preservation treatments selected for this project are based on the current condition of the road, utility coordination and efficient road groupings. These types of sealant projects represent relatively low-cost improvements (compared to roadway rehabilitation projects) that prolong the effective life of roadways in good/fair condition. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Power Transmission projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
- LOT-12 MAIN HOUSE(PLAN 1A),2-STOREY SFR W/ ASSOC UTIL./LDSCP TOTAL AREA: LIVING 2256 SF,GARAGE 437,PORCH 41; 4 BED/3 BATH
- LOT-7 HOUSE(PLAN 1A),2-STOREY SFR W/ ASSOC. UTIL./LDSCP TOTAL AREA: LIVING 2256 SF,GARAGE 437,PORCH 41; 4 BED/3 BATH
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- LOT-4 MAIN HOUSE(PLAN 1A),2-STOREY SFR W/ ASSOC. UTIL./LDSCP TOTAL AREA: LIVING 2256 SF,GARAGE 437,PORCH 41; 4 BED/3 BATH
