2023 Utility Replacement
Closed · Washington · Last reported May 2023
Source: Dodge USA
The project covered by these specifications and bid documents involves five schedules (A, B, C, D, and E) in the construction of the City of Edmonds 2023 Utility Replacement Project. The project consists of 15 LF of 6-inch restrained joint ductile iron pipe with associated fittings and other appurtenances; 115 LF of 8-inch restrained joint ductile iron pipe with associated fittings and other appur
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Car parking, Power Transmission, Waste Processing and Treatment, Government, Automotive, Steel, Commercial, Power Generation (CCGT)
- Location
- Edmonds, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2023 Utility Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project covered by these specifications and bid documents involves five schedules (A, B, C, D, and E) in the construction of the City of Edmonds 2023 Utility Replacement Project. The project consists of 15 LF of 6-inch restrained joint ductile iron pipe with associated fittings and other appurtenances; 115 LF of 8-inch restrained joint ductile iron pipe with associated fittings and other appurtenances; 1,740 LF of 12-inch restrained joint ductile iron pipe with associated fittings and oth... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Edmonds |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Car parking, Power Transmission, Waste Processing and Treatment, Government, Automotive, Steel, Commercial, Power Generation (CCGT) |
Article published date | 2023-05-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
