2023 Utility System Improvements
Sector: Water Supply and Storage • Location: Algoma, Wisconsin, United States of America
Source: Dodge USA
Big Lake Lift Station Abandonment Summit Beach Lift Station Pump and Piping Replacement Bell Harbor Lift Station Pump Replacement 1,425 LF of 6-inch PVC Forcemain 260 LF of 30-inch PVC Storm Sewer.
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Seaport, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT)
- Location
- Algoma, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2023 Utility System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Big Lake Lift Station Abandonment Summit Beach Lift Station Pump and Piping Replacement Bell Harbor Lift Station Pump Replacement 1,425 LF of 6-inch PVC Forcemain 260 LF of 30-inch PVC Storm Sewer. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Algoma |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Seaport, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT) |
Article published date | 2023-07-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
