2023 Various Roadway Improvements
Sector: Water Supply and Storage • Location: Passaic, New Jersey, United States of America
Source: Dodge USA
The scope of work within the Base Bid will consist of milling, resurfacing, ADA ramp construction and associated sidewalk transitions to ADA Ramps and curb, select sidewalk reconstruction, select full-depth roadway repair, concrete island construction, installation of pavement striping, resetting of all sanitary structures and storm drainage structures on Passaic Street from State Street to Market
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Cement, Car parking, Government, Waste Processing and Treatment, Manufacturing (Industrial), Automotive, Commercial
- Location
- Passaic, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2023 Various Roadway Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work within the Base Bid will consist of milling, resurfacing, ADA ramp construction and associated sidewalk transitions to ADA Ramps and curb, select sidewalk reconstruction, select full-depth roadway repair, concrete island construction, installation of pavement striping, resetting of all sanitary structures and storm drainage structures on Passaic Street from State Street to Market Street (Sta. 0+00 Sta. 18+05), Exchange Place from Passaic Street to Pennington Avenue (Sta. 0+0... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Passaic |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Cement, Car parking, Government, Waste Processing and Treatment, Manufacturing (Industrial), Automotive, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
