logo
ProjectClosed

2023 Water Main Replacement Phase 2

One of 10,000+ projects Taiyo tracks in Missouri.

Source: Dodge USA

The Project consists of furnishing and installing C900 PVC pipe, ductile iron fittings, gate valves, fire hydrant assemblies, thrust blocks, connection restraints, surface restoration, traffic control, and appurtenances.

Status
Closed
Sector
Metal, Water Supply and Storage, Government, Steel, Commercial, Waste Processing and Treatment
Location
Trenton, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 2023 Water Main Replacement Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2023 Water Main Replacement Phase 2” is an infrastructure initiative in the Metal sector, located in Trenton, Missouri, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project consists of furnishing and installing C900 PVC pipe, ductile iron fittings, gate valves, fire hydrant assemblies, thrust blocks, connection restraints, surface restoration, traffic control, and appurtenances.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Trenton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Metal, Water Supply and Storage, Government, Steel, Commercial, Waste Processing and Treatment

Article published date

2024-03-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project