2023 Water Main Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
furnishing of materials, labor, and equipment for the construction of 2023 Water Main Replacement, Town of Cary Project No. WT3305. A summary of the approximate quantities involved are as follows: Base Bid 250 LF 4-Inch Ductile Iron Water Line 420 LF 6-Inch Ductile Iron Water Line 3,500 LF 8-Inch Ductile Iron Water Line 60 LF 12-Inch Ductile Iron Water Line 1,150 LF 8 Ductile Iron Sanitary Sewer P
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Waste Processing and Treatment, Government, Steel, Commercial
- Location
- Cary, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2023 Water Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | furnishing of materials, labor, and equipment for the construction of 2023 Water Main Replacement, Town of Cary Project No. WT3305. A summary of the approximate quantities involved are as follows: Base Bid 250 LF 4-Inch Ductile Iron Water Line 420 LF 6-Inch Ductile Iron Water Line 3,500 LF 8-Inch Ductile Iron Water Line 60 LF 12-Inch Ductile Iron Water Line 1,150 LF 8 Ductile Iron Sanitary Sewer Pipe 3,670 LF Abandoned Existing Water Line 7 EA Fire Hydrant Assemblies 7 EA Abandon Fire Hydrant... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Cary |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Waste Processing and Treatment, Government, Steel, Commercial |
Article published date | 2024-04-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
