2023 Water Program Booster Pump Addition Piping Modification
Sector: Water Supply and Storage • Location: New Roads, Louisiana, United States of America
Source: Dodge USA
The Work consists of site work, connecting the new well to the distribution, chemical feed upgrades, and electrical work at the new Mix Water Well No. 3 location. chemical feed upgrades, booster pump additions, and electrical work at the existing Mix well and elevated tank site. site work, chemical feed upgrades, booster pump addition, and electrical work at the existing Lakeland Well and elevated
- Status
- Closed
- Sector
- Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Road, Government, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- New Roads, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2023 Water Program Booster Pump Addition Piping Modification
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work consists of site work, connecting the new well to the distribution, chemical feed upgrades, and electrical work at the new Mix Water Well No. 3 location. chemical feed upgrades, booster pump additions, and electrical work at the existing Mix well and elevated tank site. site work, chemical feed upgrades, booster pump addition, and electrical work at the existing Lakeland Well and elevated tank site. and site work, connecting the new well to the distribution, and electrical work at th... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | New Roads |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Road, Government, Commercial, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
