2024-25 Overlay B
Closed · California · Last reported Mar 2025
Source: Dodge
The work to be performed includes, but is not limited to, furnishing all materials, equipment, tools, labor, and incidentals as required by the plans, specifications, and contract documents for the reconstruction or repair of City streets at various locations throughout the City of Santa Clarita. See plans in Exhibit A for more detailed descriptions and locations of the various sites.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Road, Government, Commercial
- Location
- Santa Clarita, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2024-25 Overlay B
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be performed includes, but is not limited to, furnishing all materials, equipment, tools, labor, and incidentals as required by the plans, specifications, and contract documents for the reconstruction or repair of City streets at various locations throughout the City of Santa Clarita. See plans in Exhibit A for more detailed descriptions and locations of the various sites. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Santa Clarita |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Government, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
