2024 Alley Resurfacing Program
Sector: Car parking • Location: Davenport, Iowa, United States of America
Source: Dodge USA
Vendor: Ionwave External Bid Id: 177295Contact: Kari Thoren Contact Info: project is located at four alleys as indicated in the plans. Additional work is included at Riverview Terrace Park. The proposed improvements include, but are not limited to, the furnishing of all labor for the removal of the PCC and HMA pavement at various project locations, placement of ful
- Status
- Closed
- Sector
- Car parking, Road, Manufacturing (Industrial), Government, Automotive, Commercial
- Location
- Davenport, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Alley Resurfacing Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Vendor: Ionwave External Bid Id: 177295Contact: Kari Thoren Contact Info: kari.thoren@davenportiowa.comhis project is located at four alleys as indicated in the plans. Additional work is included at Riverview Terrace Park. The proposed improvements include, but are not limited to, the furnishing of all labor for the removal of the PCC and HMA pavement at various project locations, placement of full depth aggregate stone base material, geo fabric / grid materials if needed, reconstruction of t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Davenport |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Manufacturing (Industrial), Government, Automotive, Commercial |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
