2024 Annual Drainage
Sector: Water Supply and Storage • Location: Bainbridge Island, Washington, United States of America
Source: Dodge USA
This project will install new drainage pipe and storm structures along NE Murden Cove Dr, Manitou Beach Dr NE, Weaver Rd NW, and Irene Pl NE and will replace aging cross culverts at Silven Ave NW and NE Torvanger Rd and potentially at Meadowmeer Cir NE and Misty Vale Pl NE.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Government, Waste Processing and Treatment, Raw Materials
- Location
- Bainbridge Island, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Annual Drainage
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will install new drainage pipe and storm structures along NE Murden Cove Dr, Manitou Beach Dr NE, Weaver Rd NW, and Irene Pl NE and will replace aging cross culverts at Silven Ave NW and NE Torvanger Rd and potentially at Meadowmeer Cir NE and Misty Vale Pl NE. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Bainbridge Island |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government, Waste Processing and Treatment, Raw Materials |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
