2024 Arterial and Residential Street Overlays
Closed · Washington · Last reported Jun 2024
Source: Dodge USA
Work to be performed under this contract includes, but is not limited to furnishing all labor, equipment, and materials necessary for asphalt overlay of approximately 0.4 miles of North Mercer Way, and approximately 0.3 miles of residential streets consisting of: temporary traffic control, pavement repairs, asphalt planing, full width and full depth asphalt pavement removal, hot mix asphalt paving
- Status
- Closed
- Sector
- Power Transmission, Road, Residential, Mass Transit, Government, Rail, Commercial, Power Generation (CCGT)
- Location
- Mercer Island, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Arterial and Residential Street Overlays
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work to be performed under this contract includes, but is not limited to furnishing all labor, equipment, and materials necessary for asphalt overlay of approximately 0.4 miles of North Mercer Way, and approximately 0.3 miles of residential streets consisting of: temporary traffic control, pavement repairs, asphalt planing, full width and full depth asphalt pavement removal, hot mix asphalt paving, shoulder restoration, utility adjustments, and pavement markings |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Mercer Island |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Road, Residential, Mass Transit, Government, Rail, Commercial, Power Generation (CCGT) |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
