2024 Arterial Rehabilitation
Closed · California · Last reported Jun 2024
Source: Dodge USA
Edinger Ave (Countess to Saybrook) The project consists primarily of cold milling of the existing pavement, Cold In-placed Recycling of existing asphalt concrete, rubberized asphalt concrete (RAC) surface course paving, limited removal and installation of concrete curb and gutter, concrete sidewalk, installing truncated domes, tree replacements, adjusting valves to grade, installing striping and s
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Consumer Products, Automotive, Government, Commercial, Manufacturing (Industrial)
- Location
- Huntington Beach, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2024 Arterial Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Edinger Ave (Countess to Saybrook) The project consists primarily of cold milling of the existing pavement, Cold In-placed Recycling of existing asphalt concrete, rubberized asphalt concrete (RAC) surface course paving, limited removal and installation of concrete curb and gutter, concrete sidewalk, installing truncated domes, tree replacements, adjusting valves to grade, installing striping and signage.Talbert Ave (Edwards to West City Limits) The project consists primarily of cold milling o... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Huntington Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Consumer Products, Automotive, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
